Hosting for digital asset mining, built on industrial power.
ASIC fleets run on contracted power in energised facilities, with cooling, network and operations handled on site. One agreement, one point of contact, and you keep the hardware.
Every layer under the hardware
We hold the whole stack so the only thing you run is the machine on top.
Contracted and energised before hardware arrives
Industrial capacity on grid as the rule. Load is balanced across feeds and power work is coordinated with the customers it affects.
Air-cooled containers as standard
Containers are the unit of capacity. Where density calls for it, the containers are hydro cooled.
Fibre with a second path
Fibre to the facility with a wireless backup, so a single cut does not take the fleet offline.
A team on site, 24/7
Technicians on shift around the clock with documented runbooks, monitoring, reporting and remote hands within four hours.
One agreement covers the site, the power and the operations.
- Site
- Industrial facilities built for continuous load
- Power
- Contracted and energised before hardware arrives
- Operations
- A team on site around the clock, working to written runbooks
What digital asset mining hosting means
Digital asset mining is the industry's name for running the machines that secure proof-of-work networks, Bitcoin above all. Hosting is the service that puts those machines into a facility built for them.
The machines are ASICs: purpose-built, dense, power-hungry and sensitive to heat and dust. They need industrial electricity at a stable price, airflow or liquid cooling sized for their draw, a network path that does not drop, and people who can reach a rack at three in the morning.
A service agreement moves all of that onto the operator. The customer owns the hardware, the firmware and the pool configuration, and pays a rate for the power and the operations around it. The operator secures the site, contracts the energy, builds the distribution and cooling, installs the machines and keeps them running.
Fleets that want to run, not build
Fleet owners
Operators with machines on order or already running elsewhere who need energised capacity with a short path to power on.
Funds and treasuries
Owners of mining hardware as an asset who want it run to a written standard, with reporting they can show to their own stakeholders.
Resellers and sub-hosts
Companies that sell hosting to their own customers and need a facility partner behind the agreement.
Operators relocating
Fleets leaving a site because of rising power prices or curtailment they cannot control.
The offer, page by page
ASIC hosting and colocation
What is included, how onboarding works and what we commit to in writing.
See hostingHow every facility is built and run
The written standard for power, cooling, network and access, with the commitments behind it.
How we operateHow the hosting rate is built
The components of a rate per kilowatt hour, what sits in the base rate, and a form for a quote.
See the rateHardware we host
ASIC families, cooling types and what we need from you before intake.
See hardwareHydro cooling hosting
Where air cooling stops and liquid cooling starts, and what that means for density.
See coolingInsights
Field notes on power pricing, contracts, cooling and operations from the facilities themselves.
Read the postsDigital asset mining hosting FAQ
Question not listed?
Send it through the form. Every message is read and answered by an operator.
Talk to SalesA service that places your mining hardware in a facility with industrial power, cooling, network and staff, and runs it for a rate. You keep ownership of the machines and the rewards they earn.
We host ASIC fleets for Bitcoin workloads. Talk to us about your models and power profile.
No. You own the hardware and control its pool. We provide the facility and the operations around it.
We start at 250 kW. Below that the deployment rarely justifies the setup on either side.
Capacity is energised across multiple industrial facilities. We share facility specifics under a mutual non-disclosure agreement.
Send the hardware model, the quantity, the load in kW or MW and when you want to go live through the quote form. Every message is read and answered by an operator.
Let's talk capacity.
Tell us your hardware and your timeline. We will tell you where it can run.