Operations ยท One standard

Built, secured and run to one written standard.

Every Northwatt facility follows the same specification for power, cooling, network and access, and the same written procedures for running it. This page is that specification, with the commitments behind it.

Total capacity
29MW
Active projects
3
Minimum deployment
250kW
On-site operations
24/7
The standard

How every facility is built

The specification below applies across all facilities. Where one deviates from it, the deviation is named.

Power

Contracted and energised before hardware arrives

Industrial capacity on grid as the rule, flare gas off grid where a facility is built around it. Load is balanced across feeds, switchgear is on predictive maintenance, and power work is coordinated with the customers it affects.

Cooling

Air-cooled containers as standard

Containers are the unit of capacity: blocks are added without rebuilding the facility. Where density calls for it, the containers are hydro cooled. Immersion: To be confirmed.

Connectivity

Fibre with a second path

Fibre to the facility with Starlink or a wireless link as backup, so a single cut does not take the fleet offline.

Access

Fenced, controlled and logged

Every facility is fenced, with access control and CCTV. Access is logged and visitors are escorted.

Running it

How the facilities are run

None of this is a promise about the future. It is how the facilities are operated today.

Coverage

A team on site, 24/7

Technicians work shifts on site around the clock, with remote hands within four hours of a request.

Procedures

Documented runbooks

On-site teams work to written runbooks for power, cooling and network events rather than to memory.

Change

Change management

Infrastructure changes carry a risk assessment and a rollback plan before work that could affect customer operations begins.

Monitoring

Continuous telemetry

Power draw and temperature are monitored in real time with alerting on threshold breaches.

Reporting

Written and repeatable

Monthly written reports plus incident notifications. Customers see the same dashboards we do.

Lifecycle

Controlled decommissioning

Structured decommissioning with secure data handling, hardware removal and return shipment logistics.

Commitments

What we commit to, and how it is evidenced

ItemCommitmentEvidence
SiteOne agreement for site, power and operationsNamed in the service agreement
Operating coverageOn-site team, 24/7Shift roster and runbooks
MonitoringReal-time power and temperatureCustomer dashboard
Reporting cadenceMonthly written reportDelivered by email
Incident notificationSame business dayNotification policy
Remote hands responseWithin 4 hoursService agreement
Change managementRisk assessment and rollback planChange record per change
Physical access controlEscorted access onlySite access policy
Data handling on exitSecure handling and documented returnDecommissioning record
Scope

What we cover and what stays with you

A service agreement only works when the line is drawn in writing. This is where it sits.

Northwatt provides

  • The facility, the buildings and the perimeter
  • Energy contracts and grid connection
  • Distribution, cooling and structured cabling
  • On-site staff, monitoring and remote hands
  • Documented procedures and change records

The customer provides

  • The hardware and its firmware
  • Pool and worker configuration
  • Warranty handling with the manufacturer
  • Instructions for the disposal or return of hardware
  • The commercial decision on what runs and when
Get in touch

Let's talk capacity.